ocr: Fixed manufacturing: overhead AC= E5.00 Fixed manufacturing overhead is absorbed into the units of production by means of applying an absorption rate calculated using the formula: Budgeted fixed Fixed overhead manufacturing overhead absorption rate (FOAR) Budgeted activity Theretore, in our example we get: EO.A.R. = £150,000/ /30,000 units - E5per unit.